President Akufo-Addo has commissioned the ultra-modern Flowerpot Interchange, a landmark project set to revolutionize Ghana’s road infrastructure. Located at Spintex in the Krowor Municipal of Greater Accra, this interchange will enhance the travel experience for commuters, traders, and drivers.

The Flowerpot Interchange demonstrates the government’s commitment to improving road networks and reducing congestion. By streamlining traffic flow, the project aims to boost economic activity, reduce travel times, and increase safety for all road users.
The interchange features a new road through the old tunnel at East Legon, pedestrian walkways, and road furniture including streetlights and traffic signals. Contracted to China Railway No. 5 Engineering Ghana Limited, with Deoke Consult Ltd as consultant, the project began in March 2017.
Funded by Afrexim Bank and the Government of Ghana to the tune of GHS 677,839,999.5, the interchange is expected to have a lasting impact on the local community. At the commissioning ceremony, President Akufo-Addo urged stakeholders to ensure the interchange serves its purpose and safeguard it for the long term.
This milestone underscores Ghana’s dedication to investing in its transportation network, solidifying its position as a hub for economic growth and development. The Flowerpot Interchange is a significant step towards modernizing Ghana’s infrastructure, improving lives and fostering economic prosperity.
Ruth Abla ADJORLOLO



