News

Ghana Water Ltd. Pledges Lasting Solution to Ho Water Crisis

Amazon Store

The Managing Director of Ghana Water Limited (GWL), Mr. Adam Mutawakilu, has assured residents of Ho and its environs that a lasting solution to the current water supply challenges is on the horizon. Barely a week into his tenure, Mr. Mutawakilu led a team of engineers to inspect the Kpeve Water Intake Point and Water Treatment Plant, which supplies water to the Ho Municipality and surrounding communities.

The GWL has assessed the situation and is implementing urgent measures to restore stable water supply. Although a submersible pump was deployed as an interim measure, it was unable to pump enough water for treatment and distribution. However, two new specified pumps have been procured and are expected to arrive in March to provide a medium-term but sustainable solution.

In the meantime, the GWL will collaborate with the Regional Coordinating Council (RCC) and existing service providers to supply water to affected communities using tankers. This measure aims to ensure that residents are not unduly affected by the water shortage.

President John Mahama has expressed deep concern about the water crisis in Ho and remains committed to addressing the issue. The Government is determined to achieve the “Water For All Agenda” across the country, with the President dedicated to initiating the Ho Water Expansion Project and other water projects in the region to meet growing demand.

The expansion of the Kpeve Treatment Plant is non-negotiable, as it is the long-term solution to ensure adequate water supply for the growing population. A Demand Management Programme has also been introduced to ensure equitable and sustainable water distribution within the region.

The Kpeve Water Treatment Plant currently produces an average of 11,272 cubic meters daily, significantly below the required 23,580 cubic meters needed to meet the growing water demand of Ho, Kpeve, parts of the South Dayi District, and surrounding areas.

The Volta Regional Minister, Mr. James Gunu, reiterated the Government’s commitment to resolving the water crisis in the “foreseeable future,” stressing that the Ho Water Expansion Project was a critical intervention. The RCC will soon begin supplying water to essential service institutions, including schools and hospitals, using tankers to mitigate the crisis.

Ruth Abla ADJORLOLO