The Public Utilities Regulatory Commission (PURC) Eastern Regional Office in Koforidua has taken a significant step towards energy sustainability by inaugurating a 128kwp solar installation. This move has enabled the office to operate outside the national grid, reducing electricity costs to zero.
The solar installation, comprising a 93kWp rooftop solar system and a 35kWp carport system, was funded by the German Development Cooperation (GIZ). PURC’s Executive Secretary, Dr. Ishmael Ackah, expressed gratitude to GIZ and highlighted the commission’s commitment to promoting renewable energy.
The benefits of this transition are twofold. Not only does it reduce environmental impact, but it also yields economic benefits. Prior to the solar installation, the office paid GH¢16,000 in monthly electricity bills. After installing the rooftop solar system in 2022, costs decreased by 75% to GH¢4,000. With the additional carport system, the office now generates more power than it needs, allowing it to export excess energy to the grid.
Dr. Ackah emphasized the importance of energy transition, citing empirical economic benefits and environmental advantages. The Eastern Regional Minister, Mr. Seth Kwame Acheampong, and Gyaasehene of New Juaben Traditional Area, Nana Twumasi Dankwah, also commended the initiative, urging collaboration to harness Ghana’s energy resources.
This sustainable effort serves as a model for other institutions, demonstrating the potential for significant contributions to Ghana’s energy goals while minimizing environmental impact. PURC plans to construct green buildings in Kumasi, Tamale, and Takoradi next year, further solidifying its commitment to renewable energy.





Ruth Abla ADJORLOLO



