Bulk Oil Storage and Transportation Company Limited, BOST, has achieved some significant milestones recently. They’ve completed critical projects like the Tema to Akosombo Petroleum Pipeline and the Bolga to Buipe Pipeline, which now operate with leak detection systems to secure Ghana’s fuel infrastructure.
Additionally, BOST has cleared 100% of its trade debt and loan obligations, totaling over GHS 384 million. Their revenue-earning assets have also increased from 18% in 2017 to 98% in 2024.
BOST’s vision is to be the number one fuel and logistics business in West Africa, focusing on excellence in security, safety, and profitability. They have developed a network of storage and pipeline infrastructure throughout Ghana, with six depots nationwide located in Accra Plains, Mami Water, Akosombo, Kumasi, Buipe, and Bolgatanga.
Their corporate image has transformed significantly over the years into an institution of excellence due to their high integrity and numerous successes. As part of their manifold vision, BOST aims to expand Ghana’s current strategic reserves from 6 weeks to 12 weeks.




Ruth Abla ADJORLOLO



