Vice President Mahamudu Bawumia has challenged stakeholders in the road infrastructure provision system to find innovative solutions to bridge the huge financing gap in road construction and maintenance. Speaking at a high-level panel discussion in Accra, Dr. Bawumia noted that the current financing models are insufficient to meet the nation’s road development needs.
Ghana requires $12 billion to clear the maintenance backlog and bring the 94,000 km network of roads to an optimal level, but current funding levels only cover about 38% of this requirement. The Vice President emphasized the need for sustainable financing to maintain the road network, which is critical for economic development.
Dr. Bawumia proposed exploring innovative financing models such as Public-Private Partnerships, issuance of Infrastructure and Municipal bonds, and reforming the tolling system to ensure equity in its payment. He also suggested concessioning high-volume roads and introducing congestion pricing to reduce traffic congestion.
The Minister for Roads and Highways, Hon. Francis Asenso-Boakye, disclosed that only 44% of Ghana’s road network was classified as good, with 34% fair and 22% poor, making it challenging to achieve the target of 70% good, 20% fair, and not more than 10% poor by the end of 2025.
The government has added 12,830 kilometers of roads to the national network between 2017 and 2023, nearly triple the 4,636 kilometers added by the previous administration. However, more needs to be done to bridge the financing gap and achieve sustainable road development.
Ruth Abla ADJORLOLO



